What are the three main methods of building reinforcement?
Building reinforcement is a process that ultimately leads to increasing the resistance of buildings to incoming loads and forces. There are many methods for increasing the resistance of buildings; but among all these methods, the following three methods are more practical and their effectiveness for reinforcing buildings is much greater.
1. Reinforcing a building with a concrete jacket method
2. Reinforcing a building with a FRP composite method
3. Reinforcing a building with a steel jacket method
What is reinforcing a building with a concrete jacket method?
Another method of reinforcing structures and buildings that has a great impact on the resistance of various buildings is the concrete jacket method. In this method, longitudinal or transverse rebars are planted in the concrete cross-section by means of rebar planting, and then the concrete member is reinforced by forming and re-concreting. Reinforcement using the concrete jacket method can be used to increase the load-bearing capacity of various types of concrete beams, concrete columns, concrete slabs, concrete foundations, and concrete shear walls.
In order to implement the reinforcement of a building using the concrete jacket method, it is first necessary to place the rebars according to the reinforcement design using rebar planting adhesive inside the beams, columns, building foundation, and shear walls. Then, concreting operations will be performed on all these rebars to create a resistant concrete layer around the desired element and increase the element's resistance to incoming loads.
What is FRP fiber reinforcement of a building?
One of the building reinforcement methods that has attracted the attention of many civil engineers in recent years is FRP reinforcement. This new reinforcement method can be implemented to strengthen old structures or with operational and calculation errors. The most important materials used in this reinforcement method are carbon fibers and epoxy resin. The FRP composite reinforcement method is actually a fiber-reinforced polymer that has a relatively low weight and very high tensile strength. Two parts, fibers and resin, are used to make FRP composite.
For example, if the load on the column increases, a concrete column can be wrapped with FRP composite. In this case, layers of carbon fibers can be used with epoxy resin to increase the resistance of the columns to the applied loads. If FRP fibers are implemented safely and correctly, the column resistance will increase significantly.
Today, new methods of structural repair and reinforcement, such as FRP reinforcement, are gradually replacing conventional structural reinforcement methods. Some of the advantages of building reinforcement using FRP composites are:
1. Very low weight of FRP fibers in contrast to its very high tensile strength
2. Due to the low thickness of FRP fiber layers (in the range of millimeters), it has been very noticeable to architects
3. Very high implementation speed of FRP reinforcement compared to other methods
4. High resistance to corrosion
Applications of FRP reinforcement include:
1. Column reinforcement with FRP
2. Beam reinforcement with FRP
3. Slab reinforcement with FRP
4. Foundation reinforcement with FRP
5. Shear wall reinforcement with FRP
6. Reinforcement of masonry and non-load-bearing walls with FRP
What is steel jacket reinforcement of a building?
The steel jacket method is one of the other methods of reinforcing concrete and steel buildings that has had a great impact on increasing the load-bearing capacity of buildings. This method uses steel parts that are placed around the required element, such as a column, and increase the ductility and strength of that element. This method of reinforcing buildings increases the bearing capacity of the building without significantly increasing the weight of the building.
Which method is suitable for reinforcing the building?
In the event of an execution and calculation error or a change in the use of the building, using the reinforcement method is not only useful; it is also necessary. However, one of the common questions asked by people for reinforcing the building is which method is the best method for reinforcing the building?
Choosing the best method for reinforcing the building depends on the project conditions, the cost of the reinforcement plan, the speed of work, the reason why the building needs reinforcement, etc. Therefore, it is necessary to proceed in an expert and engineered manner to choose the best method for reinforcement. Otherwise, the desired result may not be achieved even despite spending a lot of money on reinforcing the building. Therefore, you can contact the reinforcement experts of Technopole Company before taking any action to reinforce various types of buildings.
What factors does the price of building retrofitting depend on?
One of the reasons why some employers unfortunately prefer not to retrofit buildings or to replace this process is the price of building retrofitting. However, it should be noted that if retrofitting in buildings is not done in a systematic manner and reducing the safety of the building causes unfortunate incidents, the supervising engineers and other engineers who have been involved in this matter must be held accountable.
Therefore, even despite the increase in the price of retrofitting, it is necessary that this work be done in a systematic manner and in accordance with the opinions of experts. In addition, there are many factors that can affect the price of building retrofitting, and the cost paid for each building will be different.
1. The cost of specialized building retrofitting tests
One of the factors that affects the cost of retrofitting in a building
2. Design and calculation price of building retrofitting
After conducting the tests and in accordance with the results obtained, the design and calculations of the buildings will be carried out. The cost of design and calculations made for the use of steel, concrete or FRP composite will affect the total cost of retrofitting. Obviously, the more complex the design and calculations, the higher the cost received.
3. Price of materials and implementation of the building retrofitting plan
The materials prepared for retrofitting buildings must be purchased at current prices and it is obvious that the greater the amount of these materials, the higher the price of retrofitting. In addition, depending on the chosen method, the materials used can also be different. The cost of implementing the retrofitting plan for various types of buildings, the cost received from the execution teams and the complexity of the work affect the price of retrofitting.